|
Accurate Metering Products
& Services (AMPS) works on-site" with installing
electrical contactor, as needed, to insure that the
meter installation, and all of the sub-components are
installed and working correctly. Upon the metering
system installation completion, our "in-office" staff
will remotely connect to the metering system and
perform diagnostic tests to check all pertinent
parameters of the system in whole, and then within each
sub-meter.
|
|